Montague Cold store Truganina
Contrast Electrics P/L was awarded the contract for the engineering design, manufacturing and installation of a fully automated control system and electrical hardware for Montague Cold storage & Logistics centre Truganina. The Montague facility holds 30,000 pallets at -22Deg.C The project delivery time was 12 weeks.
All major components for this project were manufactured at Contrast Electrics P/L workshop in Laverton Nth. Contrast Electrics Delivered the system on time and to the complete satisfaction of the Customer.
Project Requirements.
- Design, build and install 2500A Form 4 MCC.
- Installation of wiring and controls for the following plant.
- 4 of Grasso compressors
- All compressors, condensers & evaporators are controlled by variable Speed drives.
- Pumped liquid ammonia system.
- 2 of BAC Condensers.
- 1 of Ammonia / glycol flooded plate heat exchanger with duty standby recirculation pumps.
- Glycol under floor heating loop.
- Duty and standby automated pump system.
- 4 of twin evaporator penthouse units in freezer each with variable speed drive control for evaporator fans.
- 4 of ceiling hung evaporators in annex / chiller.
- Mechanical ventilation and fresh air system for plant room & MCC room.
- Ammonia gas detection system.
- Allen Bradley PLC system comprising of 7 separate processors with over 300 Digital & analog I/O.
- Adroit SCADA system.
Engineering And Programming Solution.
- Design complete electrical and automation system,
- Instrumentation control loops design and calibration
- Produce Electrical Schematics with Auto Cad Electrical.
- Program PLC system.
- Program Adroit SCADA system.
- On site commissioning.